Educational infrastructure

History of the establishment

The establishment has known 4 important stages of its existence:

1986: INES (National Institutes of Higher Education) of industrial chemistry by decree n ° 86-172 of 05 May 1986:

- 123 students

- 2 Algerian teachers, 12 foreign teachers.

1992: set up as a University Center by executive decree n ° 92-299 of 07 July 1992:

- 2 134 students.

- 80  teachers.

2001: University composed of 3 faculties by executive decree n ° 01-273 of September 30, 2001:

- 6 784 students.

- 174  teachers.

2010:The University of Guelma was reorganized into seven (7) faculties by Executive Decree No. 10-16 of January 21, 2010.

- 15 145 students.

- 556  teachers.

2019-2020 : Currently

- 15 693 students.

- 869  teachers.

CONSISTENCY OF UNIVERSITY INFRASTRUCTURE

Most important data since the establishment of the establishment to date:

The higher education and scientific research sector in Guelma covers a total area of 65.6 ha, including 42 ha for the University of May 8, 1945 and 23.6 ha for University works.

The University May 8, 1945 - Guelma is divided into four Campuses, 7 university residences with outbuildings with a total physical capacity of 10,500 beds and 4 daily restaurants with a capacity of 800 seats each.

Old Campus

- Made between 1986-2003

- Surface: 19 ha

- Physical capacity: 5200 educational places.


4200 teaching places: (1986-2000 Programs)

1000 teaching places: Program: PN - 2001

- Overall cost of the project: 115,000,000.00DA

- Registration date: 2001.

- Date of occupation: September 2003

This campus houses two faculties with their dependencies:

  • Faculty of Science and Technology (ST)
  • Faculty of Mathematics, Computer and Material Sciences (MI / SM)

It includes:

  • 1 technology hall
  • 32 educational laboratories
  • 1 library for both faculties
  • 2 faculty administrations
  • 10 computer rooms for departments
  • 2 internet rooms
  • 1 multimedia room
  • 1 multidisciplinary language laboratory
  • 1 distance learning center
  • 1 intensive language teaching center
  • 1 sports complex
  • 1 conference room
  • 12 research laboratories
  • 1 intensive computing center
  • 5 on-call accommodation

Two university residences with outbuildings. (1986-2000 programs)

Residence AGGOUNE SALAH

  • physical capacity 1,200 beds
  • Total area: 1.91 ha

BELHASSEB AMOR Residence

  • physical capacity 1900 beds
  • Total area: 2.81 ha

Heliopolis Campus

Date of occupancy: September 2006
Area: 5.38 ha

This campus houses the Faculty of Law and Political Science (DSP) with its dependencies (area: 3ha).

  • 1 Faculty library
  • 1 Faculty administration
  • 1 internet room
  • 1 multimedia room
  • 1 computer lab room.

Capacité physique : 2300 places pédagogiques

     2000 educational places

  • Overall cost of the project: 356MDA
  • Registration date: 03/27/2005.
  • Date of occupancy: September 2006​​​​​​​

     An Amphitheater of 300pp​​​​​​​

  • Overall cost of the project: 20.3MDA
  • Registration date: 07/17/2005.
  • Date of occupancy: September 2006​​​​​​​

Residence KARA SALAH: 1000 beds with an area of 2.38ha

  • Total cost of the project: 378,35MDA
  • Registration date: 03/27/2005.
  • Date of occupancy: September 2006​​​​​​​

Restaurant central de 800 places:

  • Overall cost of the project: 42.81MDA
  • Registration date: 03/27/2005.
  • Date of occupancy: September 2006​​​​​​​

Souidani Boudjemaa Campus​​​​​​​

- Date of occupation: 2003-2005

- Area: 8.9 ha

- Physical capacity: 5,300 educational places.


 

1000 teaching places: ND 5.621.3.262.124.01.01 Program: PSRE - 2001.

- Overall cost of the project: 118 819 000.00DA

- Registration date: 04/29/01.


Faculty of 2000 teaching places with outbuildings: ND 5.621.3.262.124.03.05: PC - 2003

- Overall cost of the project: 674,000,000.00DA

- Registration date: 10/22/03.


Faculty of 2000 teaching places with outbuildings: ND 5.621.3.262.124.03.03: PN - 2003

- Overall cost of the project: 417 200 000.00DA

- Registration date: 08/25/03.


An Amphitheater with 300 seats: ND 5.621.8.262.124.05.04: PCSC-2005

- Overall cost of the project: 20,325,000.00 DA

- Registration date: 07/17/2005.


600-seat auditorium: N.F.5.621.8.262.124.09.05: PCSC-2009

- Overall cost of the project: 81,420,000.00 DA

- Registration date: 08/11/2009


Residence 2000 Hebeche Med Cherif beds on a total surface of 4.9 ha;

1st Tranche 500 Beds N.D. 5.621.5.262.124.01.02 PSRE / 2002

- Overall cost of the project: 1 54 256 000,00 DA

- Built-up areas: 7,820.00 M2

2nd Tranche 500 beds N.D. 5,621.5,262,121.01.03 PSRE / 2003

- Overall cost of the project: 149,701,000.00 DA

- Built-up areas: 6,320.00 M2

3rd Tranche 1000 Beds. N.D. 5.621.5.262.124.03.04 PSRE / 2004

- Overall cost of the project: 214,741,000.00 DA

- Built-up areas: 9,991.00 M2

New Campus​​​​​​​

- Completed in 2010

- Area: 11.13 ha

- Physical capacity: 5,500 educational places.

This campus houses:

- Faculty of Languages and Letters (LL)

- Faculty of Natural and Life Sciences and Earth and Universe Sciences (SNV / STU).

  • 2 Faculty Libraries
  • 2 Faculty administrations
  • 2 internet rooms
  • 5 computer labs
  • 10 educational biology laboratories
  • 5 digital language laboratories
  • 1 Rectorate
  • 1 conference room 600pp
  • 1 central library
  • 1 central restaurant with 800 seats

The first faculty of 2000 teaching places with dependencies Program: PCSC-2006

- Program authorization: 437.298.000DA

- Registration date: 20/02/2007

- Total built-up area: 12,114 m2

The second faculty with 3,500 educational places with outbuildings. Program: PCSC-2006

- Program authorization: 1.391.500.000DA

- Registration date: 20/02/2007

- Total built-up area: 44,443 m2

Two university residences 2000 beds each with outbuildings. Program: PCSC - 2006​​​​​​​

- Program authorization: 1,616,640,000.00

- Registration date: 24/01/2007

- Total built-up area: 59,478 m2

Salah Yahia Residence: 2000 beds with outbuildings with a total area of 4.90ha

 
 

Ghouli Brahim Residence: 2000 beds with outbuildings with a total area of 4.90ha

Residence Bouhdid Belkacem​​​​​​​

Total area: 4.6 ha

Physical capacity: 1020 beds

PROGRAM: PCSC / 2005

Overall cost of the project: 220MDA

Date of occupation: September 2011

DIRECTORATE OF UNIVERSITY WORKS (DOU)​​​​​​​

 

Built-up area: 940m2

Operation NF / 2005

Overall cost of the project: 36MDA

Date of occupation: September 2011

 

RESEARCH INFRASTRUCTURES​​​​​​​

 

10 research laboratories​​​​​​​

- Contract N ° 39/2006: Study, Monitoring and realization of a block of 10 research laboratories: 112.03MDA

- Contract N ° 58/2010: External layout of the Research laboratories block: 16,994 MDA

 

Technical platform for physico-chemical analyzes

- Notified operation: Study, monitoring and realization of a technical platform for physicochemical analyzes

- Administrative estimate: 220 MDA

Regional Center for Scientific and Technical Documentation​​​​​​​

- Notified operation: Study, monitoring and creation of a regional center for scientific and technical documentation.

- Administrative estimate 150 MDA

- In the architectural competition phase

15 research laboratories

- Notified operation: Study followed and realization of 15 research laboratories.

- Administrative estimate 210 MDA